Dirt Road Construction Quotes

Get Professional Services

Cost of Dirt Road Construction in Saint George

Constructing a dirt road in Saint George, UT, involves various elements that can significantly impact the overall cost. This guide aims to provide a comprehensive understanding of the factors influencing the cost and the common tasks associated with dirt road construction in this region.

Factors Affecting Cost

  • Soil Type: Different soil types require different preparation methods.
  • Road Length and Width: Longer and wider roads need more materials and labor.
  • Topography: Hilly or uneven terrain can increase construction complexity.
  • Drainage Requirements: Proper drainage systems are essential to prevent erosion.
  • Permits and Regulations: Compliance with local regulations can affect costs.
  • Labor Costs: Varying labor rates in Saint George, UT.
  • Material Quality: Higher-quality materials can increase costs but improve durability.
  • Equipment Rental: Costs associated with renting construction equipment.

Average Costs for Common Tasks

Task Average Cost (USD)
Site Preparation $1,500 - $3,000
Grading and Leveling $2,000 - $4,000
Gravel Installation $1,000 - $2,500
Drainage System Installation $1,200 - $2,800
Compaction $800 - $1,500
Final Grading $1,000 - $2,000

Dirt Road Construction